On 16 May, six 18-meter Kinglong BRT buses were delivered to Zaozhuang, Shandong province. These buses successfully have gone through the policemen"s test of check station of Traffic Police Detachment in the local area in June.
Kinglong BRT buses
The policemen carefully checked and confirmed the related conditions of these bus referring to the standard picture, occupancy, body color, passenger capacity, vehicle type, vehicle identification number, engine number,brand,model,shape,tire,the conformity to vehicle certification as well as "Announcement of Road Power-Driven Vehicle Manufacturing Enterprises and Products", exit, emergency hammer and fire extinguisher. It is introduced by the principal of the check station that these buses will be applied after qualification, registration and listing.
For normal application of the BRT buses, Public Transport Company actively made arrangements covering vehicle, drivers, the training of repairmen for advance-phase preparation. In the meantime, the tender of BRT intelligent dispatching system project has completed and would step into the construction phase for forthcoming debugging of vedio, radio, ticket system, safety door and information system.